SPS 151 Greenbank – Logan Water Alliance
T2 Power & Control was tasked with developing a workable design for the Greenbank SPS Upgrade that would meet the exacting standards of Logan Alliance. As a part of the project, T2 Power & Control completed the installation of the electrical and PLC equipment onsite, including all required cabling. This was a combination of the installation of new equipment, refurbishment of existing equipment and reconfiguration of the existing switchboards to suit the new motor control equipment, including the modifications to the existing PLC program and SCADA system.
T2 Power & Control developed a workable design that would utilise as much of the existing plant as possible, while working with the principal contractor to make sure that all specification were met. This allowed T2 Power & Control to deliver a project in partnership with the principal contractor, on time and on budget, for a mutually beneficial outcome for all stakeholders.